COMPLETED PROJECTS

placeholder
  • February 2021 – October 2021

    TUZ GOLU GAS STORAGE EXPANSION PROJECT

    Owner: Boru Hatları ile Petrol Taşıma A.Ş. (BOTAŞ)
    Contractor: Gizil Enerji San. ve Tic. A.Ş.
    Scope Of Work:
    • Electrical and instrumentation works related to low voltage/low current systems
    • Instrumentation of process equipments
    • Electrical ‘Heat Tracing’ works
    • Completion of SCADA, DCS, and RTU hardware equipment
    • Commissioning activities

  • March 2022 – July 2022

    ÇATALAĞZI THERMAL POWER PLANT MAINTENANCE & CONTROL WORKS PROJECT

    Owner : Eren Enerji Elektrik Üretim A.Ş.
    Contractor : Eren Enerji Elektrik Üretim A.Ş.
    Scope Of Work :
    • Quality control, inspections, and reporting activities of electrical works
    • Quality control, inspections, and reporting activities of instrumentation works

  • August 2022 – December 2022

    PETKİM 2022 PLANNED SHUTDOWN WORKS PROJECT

    Owner : Socar Turkiye Petrokimya A.Ş.
    Contractor : ENKA İnşaat Sanayi A.Ş.
    Scope of Work :
    In the Ethylene, Ethylene Oxide, DW, and Cooling Water Areas;
    • Pipe, pipe support installation and welding works
    • Hydrostatic tests, flushing, chemical/mechanical cleaning, and completion activities of pipelines
    • Equipment dismantling, installation and calibration activities of moving parts

  • November 2022 – February 2023

    TÜPRAŞ İZMİR REFINERY CCR REVAMP PROJECT

    Owner : Türkiye Petrol Rafinerileri A.Ş.
    Contractor : Gemont Endüstri Tesisleri İmalat ve Montaj A.Ş.
    Scope of Work :
    • Pipe, pipe support fabrication, installation and welding works
    • Hydrostatic tests, flushing, chemical/mechanical cleaning, and completion activities of pipelines
    • Scaffolding installation and dismantling works.
    • Additional burner installations and existing burner revisions in the CCR furnace area.
    • Air cooler disassembly, assembly, and revision works.
    • Static and rotating equipment installation works
    • Steel structure installation works

  • December 2022 – December 2024

    SAKARYA GAS FIELD DEVELOPMENT PROJECT (PHASE-1)

    Owner : TP-OTC (Turkish Petroleum Offshore Technology Center)
    Contractor : Dowell Schlumberger Inc. (SLB)
    Scope of Work :
    • Pipe, pipe support fabrication, installation and welding works
    • Pump alignment works.
    • Steel structure installation works
    • Hydrostatic tests, flushing, chemical/mechanical cleaning, and completion activities of pipelines
    • Mechanical completion works
    • Energization of electrical panels.
    • ‘Motor-Solo-Run’ tests
    • Instrument system checks and performing loop tests
    • Installation of lighting systems, making connections, and commissioning
    • Instrument Tubing installation works

  • December 2023 – October 2024

    SASA PTA PROJECT

    Owner : SASA Polyester Sanayi A.Ş.
    Contractor : Metropol İnşaat Sanayi ve Ticaret A.Ş.
    Scope of Work :
    • Cable installation for electrical and instrumentation systems
    • Testing and termination of electrical and instrumentation cables
    • ‘Motor-Solo-Run’ tests
    • Loop tests ve commissioning activities
    • Instrument installation works
    • Instrument ‘Hook-Up’ installation and tests
    • Lighting cable pulling, terminations, and testing
    • Electrical and instrumentation tray installation works
    • Quality control and inspections of electrical and instrumentation works
    • Electrical ‘Heat Tracing’ works

  • August 2024 – October 2024

    STAR REFINERY 2024 PLANNED SHUT DOWN WORKS PROJECT

    Owner : Socar Türkiye Petrokimya A.Ş.
    Contractor : ENKA İnşaat Sanayi A.Ş.
    Scope of Work :
    In the U-130 / U-140 / U-150 units located in Area-2;
    • Pipe, pipe supports dismentling, installation and welding works
    • Hydrostatic tests, flushing, chemical/mechanical cleaning, and completion activities of pipelines
    • Equipment disassembly, assembly, and calibration activities of moving parts