COMPLETED PROJECTS

placeholder
  • 2023

    GEMONT A.Ş. - İZMİR TÜPRAŞ REVAMP (ALİAĞA/İZMİR)

    • Pipe & Support Manufacturing, Installation and Welding Works
    • Piping Reinstatements & Hydro Test Preparation Works
    • Scaffolding Works
    • New burners assembly Exist burners revisions
    • Drum tray revisions
    • Coolers disassembly & assembly & revisions
    • Tanks assembly
    • Pumps alignments Steel structure Works
    • Electrical Cable Pulling and Connection
    • Lighting Installation
    • Engine Solo Run Tests
    • Electrical Testing and Commissioning Works
    • Instrument Cable Pulling and Connection
    • Instrument Mounting
    • Hook-Up Mounting
    • Loop Tests and Commissioning Works

  • 2022

    ENKA İNŞ. AND SEC. A.Ş - PETKİM 2022 PLANNED STOP (ALİAĞA/İZMİR)

    At Ethylene, Ethylene oxide, Demin Water and Cooling Water Areas,

    • Pipe & Support Manufacturing, Installation and Welding Works
    • Piping Reinstatements & Hydro Test & Flushing & Cleaning
    • Equipment disassembly, assembly, calibration of movable parts and internal Works

  • 2022

    EREN ENERJİ - ÇATALAĞZI THERMAL POWER PLANT (ZONGULDAK)

    Scope of Works is to Perform

    • Quality Control and Inspection Works of Electrical, Instrumentation,
    • Mechanical Installation – Maintenance and Commissioning stages.

    Performed Checks, Inspections and Reportings:

    For maintenance works scope, target of activities has been to perform productive maintenance, which is to perform long term preventive solutions on equipment, reducing downtime and increasing asset reliability in the long run. Our approach has been to reduce losses in man-power, time and consequitively financials. The works performed were perfectly aligned with European Norms and International Standards.

  • 2021

    LATEST ENERGY - TUZ LAKE STORAGE FACILITY (AKSARAY)

    The employer planned the expansion of the underground storage (UGS) facility located in the Salt Lake salt cave area. The design and construction of underground facilities is divided into two stages; The 3rd phase consists of 12 caves that need to be ready for gas operation, and the 4th phase consists of 28 caves that need to be prepared for gas operation. Following the completion of the project, Turkey's natural gas supply security has been ensured.
    The scope of the work includes electrical and instrumentation works of low current systems, process equipment instrumentation, Heat Tracing works, completion of SCADA, DCS and RTU hardware equipment, as well as commissioning activities for the relevant systems.