    SCHLUMBERGER - SAKARYA GAS FIELD DEVELOPMENT PROJECT (FILYOS/ZONGULDAK)

    • Pipe & Support Manufacturing, Installation and Welding Works Pumps Alignments
    • Steel Structure Works
    • Reinstatements & Hydro Test Preparation Works
    • Mechanical Completion Works Electrical Panel Energizing Works Electrical Motor Solo-run Works
    • Instrument Sub-System Control and Loop Test Works
    • Electrical Lighting System Equipment Installation, Connection and Commissioning of the System
    • Instrument Tubing Works

  • 2023

    SASA - PTA PROJECT ELECTRICAL CONNECTION WORKS (ADANA/SEYHAN)

    • Cable Connection Procedures
    • Cable Gland Assembly
    • Cable Test and Megger
    • Loop Test
    • Commissioning